01. The Challenge
Pipeline construction projects face unique challenges that require specialized ground protection solutions. Environmental sensitivities in pipeline corridors demand zero-impact access, while seasonal weather constraints and remote locations complicate logistics. Equipment loads ranging from 100,000 to 400,000 pounds must be safely distributed across varying soil conditions, from wetlands to mountainous terrain. Traditional mixed hardwood mats often fail under these conditions, leading to costly project delays, frequent mat replacements, and potential environmental violations. Construction managers need a reliable solution that can withstand heavy loads, resist weather degradation, and minimize environmental impact throughout multi-year pipeline projects.
02. Our Solution
World Forest Group’s Eucalyptus timber mats provide a comprehensive solution for pipeline construction challenges through superior material properties and proven field performance.
**Step 1: Site Assessment & Mat Specification** Our team works with project engineers to evaluate soil conditions, equipment requirements, and environmental constraints. We specify mat thickness (4″-12″), size configurations, and layout patterns optimized for your specific pipeline corridor.
**Step 2: Logistics Planning & Delivery** With 25% more mats per truck than traditional alternatives, we reduce transportation costs and environmental impact. Our 5-6 week lead time allows for strategic delivery scheduling that matches your construction timeline, eliminating on-site storage costs.
**Step 3: Installation & Layout** Eucalyptus mats install using standard equipment and can be configured for single-lane, double-lane, or working pad applications. The superior density (55-65 lbs/ft³) provides stable foundations even in soft soil conditions, while weather-resistant properties ensure consistent performance across seasons.
**Step 4: Project Duration Maintenance** Unlike mixed hardwood requiring 15-25% annual replacement, Eucalyptus mats maintain structural integrity throughout multi-year projects. Our customers report 0% attrition rates after four years of continuous use, eliminating mid-project disruptions.
**Step 5: Recovery & Reuse** At project completion, Eucalyptus mats can be recovered and reused across 3-5 additional projects over their 5-7 year lifespan. This multi-project capability dramatically reduces per-project costs compared to disposable alternatives.
03. Measurable Results
35%
Cost Savings
Total cost reduction vs. mixed hardwood alternatives including purchase, transportation, and replacement costs
2 weeks ahead
Schedule Performance
Project completed ahead of schedule due to zero mat-related delays or replacements
0 violations
Environmental Compliance
Zero environmental incidents or violations throughout 18-month pipeline construction
40% fewer changes
Mat Efficiency
Reduced mat repositioning and replacement compared to previous projects using traditional materials
"
We’ve used Eucalyptus mats on our last three major pipeline projects, and the performance difference is night and day. Zero replacements needed, even after two years of continuous heavy equipment traffic. The cost savings alone justified the switch, but the operational reliability is what keeps us coming back.
James Mitchell
VP of Operations, Midwest Pipeline Constructors
Ready to Optimize Your Project?
Get a customized cost analysis and technical specification for your pipeline construction project.